New construction of a production building

Marburg | 2016–2020

Client: CSL Behring
Area: 18.000 m²

The M245 production building is being constructed on the Görzhäuser Hof site of CSL Behring GmbH in Marburg.

The new building houses a new facility for the basic fractionation of human plasma. The new building is a seven-story building with a basement and two mezzanines. 

The following areas were planned by fs l architekten for the general planner Labo Tech Planungs GmbH:

  • Building envelope
  • Exterior facilities
  • Tank farm incl. building for refrigeration 
  • BIM coordination model