New construction of a production building
Marburg | 2016–2020
Client: CSL Behring
Area: 18.000 m²
The M245 production building is being constructed on the Görzhäuser Hof site of CSL Behring GmbH in Marburg.
The new building houses a new facility for the basic fractionation of human plasma. The new building is a seven-story building with a basement and two mezzanines.
The following areas were planned by fs l architekten for the general planner Labo Tech Planungs GmbH:
- Building envelope
- Exterior facilities
- Tank farm incl. building for refrigeration
- BIM coordination model