Renovation and extension of an office and laboratory building

Marburg | 2018–2021

Client: CSL Behring

For CSL Behring, the existing laboratory building H64 was renovated and extended by one floor. In addition, a new multi-storey technical center was built on the south side using a solid construction method.

The following areas were planned by fs l architekten for the general planner Labo Tech Planungs GmbH:

  • Building envelope
  • BIM coordination model